Energy saving and efficiency upgrade of the Gymnasium-Lyceum School Complex of Rafina-Pikermi, with total area of 6,000 m2.
The energy efficiency improvements concerned both the outer shell of the buildings, as well as their electro-mechanical systems (heating, cooling, lighting and hot water production), requiring minimum maintenance and offering maximum efficiency.
The estimated energy saving for the school buildings is of 45% and for the gym of 40% respectively, compared to the previous conditions.
The project was completed during the summer 2019 vacation period.
Energy saving and efficiency upgrade of the Gymnasium-Lyceum School Complex of Rafina-Pikermi, with total area of 6,000 m2.
2019
Rafina-Pikermi, Greece