Chalkida Bypass & Psachna Bypass

ROAD CONSTRUCTION PROJECTS

The scope of the project includes two road sections: the first from Nea Lampsako to the Vathrovouni Tunnel, 2 km long, and then to the Vathrovouni Tunnel section to Psachna, 14.7 km long. Optionally, the sections include:

  • the section before Nea Lampsako, towards Chalkida / High Bridge, i.e. the section "A. K. Schimatariou – Nea Lampsakos”, approximately 4.0 km long,
  • the section of the Psachni bypass and
  • the section of the North-South Evia connecting artery that connects the uneven Liani Ammos junction of the Chalkida bypass with the road network to southern Evia.

The project is expected to be financed by NSRF 2021-2027 funds. The project budget amounts to €90,898,371 plus VAT.

Project Summary

Scope:

Complete engineering and construction of cross-section highway: Lampsakos Prefecture – Vathrovouni Tunnel (P.T. 4+080 – 6+000), of the closed type arterial section b2s: Vathrovouni Tunnel – Psachna (P.T. 6+000 – 20 +760), and the sections of the option a) the section before Nea Lampsako, towards Chalkida / High Bridge, b) the section of the Psachna bypass and c) the section of the connecting artery of North - South Evia

Execution Period:

2023 - In Progress

Location:

Evia, Greece